Project evidence structured for technical review.

Every WEM case study follows one structure so consultants and contractors can compare method, controls and outcome. Case studies are published only with verified project data and the permission of the relevant parties.

Project evidence structured for technical review.

Every WEM case study follows one structure so consultants and contractors can compare method, controls and outcome. Case studies are published only with verified project data and the permission of the relevant parties.
Published case studies

Published case studies

No case studies are published yet.

Verified WEM case studies will appear here once project data, evidence and permissions have been confirmed. Until then, this page sets out the evidence framework each case study will follow. To discuss comparable work, request a technical review.

Case-study template

Placeholder — not a WEM project
01 · Problem

The structural or operational requirement the client needed solved.

[Awaiting verified project evidence]

02 · Engineering challenge

The constraints that made it difficult — structure, access, live operations, programme, interfaces.

[Awaiting verified project evidence]

03 · WEM solution

The method selected, why it suited the structure, and who approved it.

[Awaiting verified project evidence]

04 · Execution

Sequence, equipment, controls, hold points and coordination on site.

[Awaiting verified project evidence]

05 · Result

The verified outcome, measured against the approved acceptance criteria.

[Awaiting verified project evidence]

06 · Evidence

Drawings, records, photographs and completion documents that support each statement.

[Awaiting verified project evidence]

Published case studies

Published case studies

No case studies are published yet.

Verified WEM case studies will appear here once project data, evidence and permissions have been confirmed. Until then, this page sets out the evidence framework each case study will follow. To discuss comparable work, request a technical review.

Case-study template

Placeholder — not a WEM project
01 · Problem

The structural or operational requirement the client needed solved.

[Awaiting verified project evidence]

02 · Engineering challenge

The constraints that made it difficult — structure, access, live operations, programme, interfaces.

[Awaiting verified project evidence]

03 · WEM solution

The method selected, why it suited the structure, and who approved it.

[Awaiting verified project evidence]

04 · Execution

Sequence, equipment, controls, hold points and coordination on site.

[Awaiting verified project evidence]

05 · Result

The verified outcome, measured against the approved acceptance criteria.

[Awaiting verified project evidence]

06 · Evidence

Drawings, records, photographs and completion documents that support each statement.

[Awaiting verified project evidence]

Project Evidence Framework
Project evidence framework

Problem → Engineering Challenge → WEM Solution → Execution → Result → Evidence

01

Problem

The structural or operational requirement the client needed solved.

02

Engineering challenge

The constraints that made it difficult — structure, access, live operations, programme, interfaces.

03

WEM solution

The method selected, why it suited the structure, and who approved it.

04

Execution

Sequence, equipment, controls, hold points and coordination on site.

05

Result

The verified outcome, measured against the approved acceptance criteria.

06

Evidence

Drawings, records, photographs and completion documents that support each statement.

Project Evidence Framework
Project evidence framework

Problem → Engineering Challenge → WEM Solution → Execution → Result → Evidence

01

Problem

The structural or operational requirement the client needed solved.

02

Engineering challenge

The constraints that made it difficult — structure, access, live operations, programme, interfaces.

03

WEM solution

The method selected, why it suited the structure, and who approved it.

04

Execution

Sequence, equipment, controls, hold points and coordination on site.

05

Result

The verified outcome, measured against the approved acceptance criteria.

06

Evidence

Drawings, records, photographs and completion documents that support each statement.

What each case study records

What each case study records — where publishable

Each field is populated only from verified project records. Names, images and testimonials need permission from the client and relevant parties. Fields without verified data are omitted rather than estimated.

Project identity

  • Project name
  • Location (emirate / site)
  • Client
  • Main contractor
  • Consultant

Scope & method

  • WEM scope
  • Site constraints
  • Method
  • Equipment
  • Programme

Control & quantities

  • HSE controls
  • Quantities
  • Authority / permit interface

Evidence

  • Drawings
  • Before / during / after media
  • 3D / 4D sequences
  • Completion evidence
  • Testimonial (with permission)
Evidence expected by service family

Evidence expected by service family

Service family A

Concrete Cutting & Coring

  • Engineer-approved opening drawings
  • Scan reports and marked-up positions
  • Temporary-works design and inspection records
  • Method statement and risk assessment
Concrete Cutting & Coring evidence requirements→
Service family B

Controlled Demolition

  • Demolition sequence and method statement
  • Temporary-works design and inspection records
  • Vibration / dust / noise monitoring records where specified
  • Waste segregation and disposal records
Controlled Demolition evidence requirements→
Service family C

Concrete Repair & Restoration

  • Condition survey and diagnosis
  • Approved repair specification and material data
  • Surface-preparation acceptance records
  • Material batch records and test results
Concrete Repair & Restoration evidence requirements→
Service family D

Structural Strengthening

  • Approved strengthening design and system data
  • Substrate test results
  • Installation records per member
  • Inspection hold-point sign-offs
Structural Strengthening evidence requirements→
Service family E

Scanning & Diagnostics

  • Scan reports and marked-up drawings
  • Photographs of surface markings
  • Correlation of findings with cores or cuts
  • Engineer review records where structural elements were affected
Scanning & Diagnostics evidence requirements→
Service family F

Dismantling & Decommissioning

  • Isolation records
  • Lifting plans
  • Permits (with project permission)
  • Waste and disposal records
Dismantling & Decommissioning evidence requirements→
Discuss a comparable requirement

Discuss a comparable requirement

Review the relevant service family, the technical guidance and WEM’s credential framework, then send your requirement for technical review.